Press "Enter" to skip to content

花花酱 LeetCode 1953. Maximum Number of Weeks for Which You Can Work

There are n projects numbered from 0 to n - 1. You are given an integer array milestones where each milestones[i] denotes the number of milestones the ith project has.

You can work on the projects following these two rules:

  • Every week, you will finish exactly one milestone of one project. You must work every week.
  • You cannot work on two milestones from the same project for two consecutive weeks.

Once all the milestones of all the projects are finished, or if the only milestones that you can work on will cause you to violate the above rules, you will stop working. Note that you may not be able to finish every project’s milestones due to these constraints.

Return the maximum number of weeks you would be able to work on the projects without violating the rules mentioned above.

Example 1:

Input: milestones = [1,2,3]
Output: 6
Explanation: One possible scenario is:
​​​​- During the 1st week, you will work on a milestone of project 0.
- During the 2nd week, you will work on a milestone of project 2.
- During the 3rd week, you will work on a milestone of project 1.
- During the 4th week, you will work on a milestone of project 2.
- During the 5th week, you will work on a milestone of project 1.
- During the 6th week, you will work on a milestone of project 2.
The total number of weeks is 6.

Example 2:

Input: milestones = [5,2,1]
Output: 7
Explanation: One possible scenario is:
- During the 1st week, you will work on a milestone of project 0.
- During the 2nd week, you will work on a milestone of project 1.
- During the 3rd week, you will work on a milestone of project 0.
- During the 4th week, you will work on a milestone of project 1.
- During the 5th week, you will work on a milestone of project 0.
- During the 6th week, you will work on a milestone of project 2.
- During the 7th week, you will work on a milestone of project 0.
The total number of weeks is 7.
Note that you cannot work on the last milestone of project 0 on 8th week because it would violate the rules.
Thus, one milestone in project 0 will remain unfinished.

Constraints:

  • n == milestones.length
  • 1 <= n <= 105
  • 1 <= milestones[i] <= 109

Solution: Math

Let x be the longest project.

Case 1: x > sum of the rest.

Obviously, we cannot finish it.
The best we can do is : [x, a}, {x, b}, {x, c}, …., {x, z}, x.
Ans = 2 * rest + 1

Case 2: x <= sum of the rest.

We can finish all the projects by alternating them properly.
Ans = sum

Time complexity: O(n)
Space complexity: O(1)

C++

请尊重作者的劳动成果,转载请注明出处!花花保留对文章/视频的所有权利。
如果您喜欢这篇文章/视频,欢迎您捐赠花花。
If you like my articles / videos, donations are welcome.

Buy anything from Amazon to support our website
您可以通过在亚马逊上购物(任意商品)来支持我们

Paypal
Venmo
huahualeetcode
微信打赏

Be First to Comment

Leave a Reply